Home » Advocate Center (Bulls Practice Facility)
In June of 2013 our team, led by our long-time customer JMS Electric, was awarded the scope of work for the Chicago Bull’s new training facility. The building was to be built on an existing United Center parking lot. This brand-new state-of-the-art facility, designed by 360 Architecture, would be the new home of the entire Chicago Bulls organization.
M&R’s scope of work involved all the structured cabling, security, fire alarm, and AV systems.
We furnished and installed a complete end-to-end TE Connectivity solution that included over 600 CAT6A data drops, 100+ strands of single-mode and multimode fiber optic cable, a state-of-the-art integrated video management and security management system. Additionally, with the support of long-time AV partner TVTI Inc., our team installed a first-rate AV system that included a crowd simulation system on the practice courts.
We were honored to be a part of this project and appreciate the business that we have conducted with the Chicago Bulls beyond this project.
- Audio Visual
- McHugh Construction
- Safety
- Security
- Structured Cabling
- TVTI